PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block work around the UCIA Roof Facing North-West.jpg Installed copper piping for the radiant panels at the 4th floor Facing East.jpg Installed junction boxes at 1st floor cmu wall Facing North-East.jpg Laying out block at Elevator 5,6 divider wall Facing North.jpg Continued sheathing and installing insulation at the parapet (South Elevation).jpg Installed roofing membrane at the lower roof Facing North.jpg
Previous pageNext page Continued sheathing and installing insulation at the parapet (South Elevation)
Continued sheathing and installing insulation at the parapet (South Elevation)